RELOCATION OF PROPANE PEAK-SHAVING SYSTEM
APPLIED ENGINEERED SYSTEMS completely disassembled and relocated the propane peak-shaving system from N.Augusta, SC to Greer, SC. The system consists of
five (5) 60,000 gallon propane tanks,
two (2) 3,000 GPH propane vaporizers,
two (2) vertical turbine pumps, and
two (2) modular buildings.
One building contains a 312 MM BTU/HR propane-air mixing system and a computerized control system. The other building contains two (2) 300 HP, 210 PSIG compressors, one instrument air compressor and the MCC for the total system. Each 60,000 gallon propane tank weighs 100,000 lb. and is 11 ft. in diameter and 90 ft. long. These tanks and buildings were moved from N.Augusta to Greer over the state roads on special trucks. The complete system was completely re-installed by APPLIED ENGINEERED SYSTEMS on Greer CPW's property. New foundations, underground piping and electrical wiring were designed and installed to accommodate the system components.KIMBERLY-CLARK CORPORATION
Hwy 5
Beech Island, SC 29841
Mr. Peter Zerger, Project Engineer
(803)827-1100 or 827-6516
Propane Storage and Stand-by System
Turn-key Engineering & Construction Responsibility
2 - 30,000 WG, A/G tanks
60 mm BTU/HR Propane/Air System
AMOUNT - $210,000SPRINGS INDUSTRIES,INC.
GRACE COMPLEX
Grace Avenue
Lancaster, SC 29720
Mr. W.R. Crimminger, Jr., Sr. Project Engineer
(803)286-3213
Propane Storage and Stand-by System
Turn-key Engineering & Construction Responsibility
3 - 30,000 WG, U/G tanks
260 mm BTU/HR Propane/Air System
AMOUNT - $495,000SOUTH CAROLINA ELECTRIC & GAS COMPANY
106 langley Dam Rd.
Langley, SC 29834
Mr. Wayne Ussery, Technical Supervisor
(803)642-6272
Upgrade Existing propane/Air System to 416 mm BTU/HT (10,000 MCF/day) @ 185 PSIG
Totally integrated PLC/PC Computerized Control System
AMOUNT - $270,000ALUMAX OF SOUTH CAROLINA
Post Office Box 1000
Goose Creek, SC 29445
Mr. Tim Walgren or Danny Grooms
(803)572-3700
Propane Storage and Stand-by System
Turn-key Engineering & Construction Responsibility
4 - 90,000 WG, U/G tanks
300 mm BTU/HR Propane/Air System
AMOUNT - $500,000ANACONDA ALUMINUM COMPANY
Post Office Box 44
Henderson, KY 42420
Mr. John Mathias
(502)521-7811
Propane Storage and Stand-by System
Turn-key Engineering & Construction Responsibility
5 - 90,000 WG, U/G tanks
AMOUNT - $1,000,000GASTON COPPER RECYCLE CORPORATION
Post Office Box 218
Gaston, SC 29053
Mrs. Mary Corley
(803)796-4720
Propane Storage and Propane/Air Stand-by System
Turn-key Engineering & Construction Responsibility
12 - 90,000 WG, U/G tanks
300 mm BTU/HR Propane/Air System
AMOUNT - $1,650,000R.J. REYNOLDS TOBACCO CO.
Tobaccoville Cigarette Factory
Tobaccoville, NC
Propane Storage and Vaporizing System
Turn-key Responsibility
4 - 60,000 WG, A/G tanks
1 - Rail Unloading Station
1 - Transport Unloading Station
1 - 600 GPH Vaporizer
AMOUNT - $400,000IC TURBINE PROPANE FUEL SYSTEMS FOR ELECTRIC GENERATIONCAROLINA POWER & LIGHT CO.
Post Office Box 1551
Raleigh, NC 27602
(919)546-6352
IC Generating Turbine Propane Fuel Storage, Piping and Vaporizing System
Turn-key Engineering & Construction Responsibility
7 - 11,000 GPH, 250 PSIG Vaporizing/Superheaters
5 - 90,000 WG, U/G tanks
AMOUNT - $3,000,000CINCINNATI GAS & ELECTRIC COMPANY
Post Office Box 960
Cincinnati, OH 45201-0960
Mr. Robert Carey
(513)632-2621
IC Generating Turbine Propane Fuel Storage, Piping and Vaporizing System
Engineering and Process Equipment Procurement Responsibility
6 - 15,000 GPH, 300 PSIG Vaporizer/Superheaters
6 - 90,000 WG, U/G tanks
AMOUNT - $3,200,000